WELLHOUSE CONSTRUCTION

A wellhouse built around the equipment inside.

The starting point was a concrete slab with the well equipment already in place. We built the enclosure around that arrangement, from the wall frames and front opening to the gable roof and painted exterior.

THE WORK
Wellhouse enclosure construction
THE FOUNDATION
Existing concrete slab
Read the story ↓
White wellhouse with dark trim, a gable roof and double doors beside a wooded path.
The wellhouse exterior, with white siding, dark trim and double doors.

FRAMING AROUND WHAT IS THERE

The equipment and slab came before the walls.

The first photograph shows the exposed slab, tank and connected equipment. The next stage brings the new timber wall frames around that same arrangement, with the doorway framed at the front.

The work shown is the enclosure: its walls, roof, siding, trim and doors. The photographs follow that construction from the open frame to the painted exterior.

THE EXISTING BASE & NEW FRAME

From exposed equipment to enclosure framing.

Well equipment exposed on a concrete slab, with a crew member beside it.
The existing concrete slab and exposed well equipment before the new framing.
New timber wall frames surrounding well equipment on the concrete slab.
New wall framing around the equipment, with the front opening framed.

THE EXTERIOR

A gable roof and double doors beside the wooded path.

White vertical siding and dark trim define the finished exterior. The double doors face the path, with the gable roof above them. That exterior view completes the sequence begun with the exposed concrete slab.

EXPLORE THE SERVICE

Removal & replacement

REPLACING A WELLHOUSE OR EQUIPMENT ENCLOSURE?

Start with what is staying and what needs to change.

Share photos of the building, foundation and equipment, and let us know if another contractor is involved. We can discuss the enclosure work and how it fits into the larger job.

Discuss your replacement
Previous
Previous

Shed removal & kit assembly